BUILDING PERMIT FEES
| Single-family and duplex residences |
$0.08 per sq. ft. |
| Apartments |
$0.08 per sq. ft. |
Commercial and institutional
|
$0.08 per sq. ft. |
| Additions, remodeling, etc. |
$5.00 per $1000 of construction cost.
Minimum of $25.00 |
| Demolition |
$50.00 |
| House Moving |
$100.00 plus any additional costs incurred by the Police Dept. and/or the Utility Dept. |
Storage sheds in excess of 120 sq. ft.
|
$15.00 |
Re-inspection
|
$35.00 |
| Plan Review |
$100.00 |
| Plan Review - Bldg. Dept. |
$100.00 each review |
| Plan Review - Fire Marshall |
$100.00 each review |
ELECTRIC PERMIT FEES:
New Construction
| Single-family residence |
$0.08 per sq. ft. |
| Apartments and duplexes |
$0.08 per sq. ft. |
Commercial and institutional
|
$0.08 per sq. ft. plus $50 for service over 200 amp, plus $20 per feeder panel. |
Remodeling and Additions
| Basic permit |
$25.00 plus items listed below |
| Feeder panel |
$20.00 |
Electric outlets & fixtures
|
$0.20 each |
Service size:
100 amp
200 amp
300 amp
400 amp |
$30.00
$30.00
$45.00
$60.00 |
Other Electrical Charges
| Construction meter loop |
$15.00 |
| Mobile home hookup |
$10.00 |
Swimming pool
|
$10.00 |
| Re-inspections |
$35.00 |
PLUMBING PERMIT FEES:
New Construction
| Single-family residence |
$0.08 per sq. ft. |
| Apartments and duplexes |
$0.08 per sq. ft. |
Commercial and institutional
|
$0.08 per sq. ft. |
Remodeling and Additions
| Basic permit |
$25.00 plus items below |
| Fixture, each |
$2.50 |
Sewer yard line
|
$2.50 |
| Gas yard line |
$2.50 |
| Water Heater |
$2.50 |
| Gas piping system |
$5.50, plus $0.50 each outlet over five (5) |
| Lawn sprinkler system |
$5.00, plus $0.50 each outlet over five (5) |
| Swimming Pool |
$10.00 |
| Re-inspections |
$35.00 |
MECHANICAL PERMIT FEES:
| Single-family residence, duplex and apartments |
$40.00 per unit |
| Commercial and institutional |
$40.00 per unit |
All other types of mechanical equipment regulated by this code
|
$10.00 |
| Re-inspection |
$35.00 |
TAP FEES:
| Water Tap Fee (Standard) |
$450.00 - Each building will be classified as a separate connection. |
| Water Tap Fee (Non-Standard) |
$20.00 per foot of line extension. If the actual cost is less, the City will reimburse the difference. |
Sewer Tap Fee (Standard)
|
$500.00 - Each building will be classified as a separate connection. |
| Sewer Tap Fee (Non-Standard) |
$20.00 per foot of line. If the actual cost is less, the City will reimburse the difference. |
| Electrical Tap Fee (Standard) |
$400.00 |
| Elecric Tap fee (Non-Standard) |
Single Phase overhead $9.20 per foot (acsr)
3-Phase overhead $15.70 per foot (acsr)
Single Phase underground $14.00 per foot (cable)
3-Phase Underground $22.80 per foot (cable)
Transformer over 50 KVA - Paid by developer/owner |
SIGNS:
| Sign (Non-Illuminated) |
$25.00 |
| Sign (Illuminated) |
$35.00 |
IMPACT FEE
The community impact fee for each living unit equivalent shall, as set forth in section 2-372 (Exhibit"A") as amended from time to time in accordance with Chapter 395, be $1,084.50 for water service and $1,173.00 for wastewater service. (Ord. No. 2004-22, § 2.3, 12-14-04).
|